|
|
|
|
|
|
|
|
|
| TOP LEFT: The missing “E” on the bell inscription has been added. TOP RIGHT & CENTER LEFT: The little church is sitting on its new foundation in the new location. CENTER RIGHT: Steel studs await installation to fill in walls. BOTTOM: Installation of the studs begins
|
|