|
|
|
|
Top Row: The west end of the vestibule is framed and the densglass sheeting goes up |
|
|
|
|
|
Center Left: The arch that frames the large window on the south side. Center Right: the flashing paper goes on getting the tower ready for plastering |
|
|
|
|
|
Bottom Left: Stacks of insulation await installation. Bottom right: Plywood sheeting for the roof deck arrives |
|